2024 Page field Airport upgrade, Ft. Myers Florida.
Since 2014 CNS has been working with the Page Field Airport to upgrade and modernize their HYVAC capabilities. In 2024 we replaced a 25 Ton Trane Rooftop HVAC unit and 30 ton Trane Rooftop HVAC unit.
See photos here. |
|
2023 Synovus Bank, Bonita Beach
CNS installed the Replacement of a 10 ton Rheem Split system at the Synovus Bank Building in Bonita Beach, Florida November 2023
, FL. See photos here. |
2022 St. Peter the Apostle Eucharistic Center project Upgrade
In August of 2022 CNS installed a 17.5 unit at the St Peter the Apostle Eucharistic Church Ministry Center, Rattlesnake Road , Naples, Florida. See photos here. |
2019 Fort Myers Southwest Regional Airport (RSW) Project
Removal and replacement of a 20 ton split system that operated in the Elevator Equipment Room on the west side of the RSW International Airport parking garage.
Click here to see a slideshow of 3 images of this project. |
2019 Page field 12.5 ton package AC unit.
This high-end project delivered 100% outside fresh air to the laboratory conditions of a Florida Dept. of Law Enforcement installation at Page Field.
See photos here. |
|
|
2018 St. Peter the Apostle Eucharistic Center project
CNS replaced a 15 ton package HVAC unit with a new Trane 15 ton package unit.
Click here to see a slideshow of 9 images of this project. |
2018 Page Field Airport (FMY) Project in Ft. Myers
CNS replaced condenser coils on a 40 ton HVAC unit at the FMY terminal.
Click here to see a slideshow of 6 images of this project. |
|
|
2017 Replaced HVAC rooftop units at Five Car rental return buildings at the Fort Myers Airport
Click here to see a slideshow of 7 images of this project. |
2017 Installation of air Conditioning Equipment at a OCCN office building in North Naples
Replacement of the indoor and outdoor AC units a total of 45 tons. |
|
|
Residential Installation
CNS Industires services services and installs heating, ventilation and air conditioning systems for business and residential clients. |
2017 project with a 1-60 ton and 1-90 ton Chiller (completed 5/11/2017)
The image below is the finished product. Click here to see an exciting slideshow of 10 images showing this CNS project in action. |
|
|
Stairwell Fire exhaust - at The Stratford at Pelican Bay |
Fort Myers Airport Project
Click here to see a slideshow of 8 images of this project. |
|
|